Gaming

​Moorefield Construction, Inc. experience includes renovating the the ground level of the low rise including the Gaming Floor, restaurants and center bar. The remodel was performed while Morongo was open and operational to their guests.

 

The Hard Rock Hotel & Casino Sacramento at Fire Mountain opened on October 31, 2019.  A few days later, the Toyota Amphitheatre hosted a Def Leppard concert. 

 

The site hosts six restaurants, a 170-room hotel, pool, fitness center, a 60,000 square foot low rise gaming floor with 1,700 slot machines and 57 table games and totals 300,000 square feet.  The project originally called for a 140,000 square foot casino, but once Enterprise Rancheria began working with the Seminole Tribe of Florida, the project more than doubled in size.  Tribal displays, showcases and Enterprise Rancheria memorabilia can be seen in the 10,000 square foot Kumi Event Center.  

​

 

BE IN 
TOUCH

Corporate Office

600 North Tustin Avenue, Suite 210

Santa Ana, CA 92705

Bus: 714.972.0700

Fax: 714.972.3030

Sacramento Office

4080 Truxel Road, Suite 200

Sacramento, CA 95834

Bus: 916.614.7888

Fax: 916.419.8870

  • White Facebook Icon
  • White Instagram Icon
Morongo Bar